Sunday, April 24, 2011

Set of 10 mm river tiles: phase 2

All of the regular tiles have been constructed, plastered, based and painted in a mic of browns and greens, and then covered with a thick layer of home made burnt umber terrain wash - and STILL there is some foam peeking through - but nothing that the subsequent flocking will not take care of.  But before flocking I am going to carefully paint the river bed white, and then gently wash with greens and blues, topped of with a good strong gloss varnish.  Some pieces are still in the pipeline:  The bridge + road crossroad, the river + stream junction, and the lock for the Carentan scenario (and any other scenario where a lock is needed, of course).  All  combined that's over 3 m of river!

1 comment: